Below is a clean, complete, industry-standard Off-Grid Solar PV Primer — integrating all the “jargon” and professional terminology you asked for, including the new ones (PV-to-Battery Ratio, PV Oversizing, Daytime Solar Fraction, Clipping, etc.). It is written in a way suitable for OVES training curriculum, engineering onboarding, or MkDocs documentation.


🌞 Off-Grid Solar PV Primer (with Industry Jargon Explained)

A modern engineering introduction to solar irradiance, PV output estimation, solar oversizing, direct-to-load supply, and seasonal design practices.


1. Solar Irradiance — The Starting Point

Irradiance = instantaneous solar power per unit area.

  • Unit: W/m²
  • Symbol: G
  • STC benchmark: 1000 W/m²
  • Range:

  • 0 W/m² at night

  • 50–150 W/m² early morning
  • 800–1000 W/m² clear mid-day

Irradiance is the “intensity” of sunlight hitting the panels at any moment.


2. Converting Irradiance into PV Output — Using Wp Rating

PV panel power rating (Wp, Watt-peak) is defined at STC: 1000 W/m² irradiance, 25°C cell temperature, AM1.5 spectrum.

Basic proportional rule:

\[ P_{\text{actual}} = P_{\text{Wp}} \times \frac{G}{1000} \]

Include system losses:

\[ \eta_{\text{system}} = 0.80 \text{ to } 0.85 \]

Full formula: $$ P_{\text{DC}} = P_{\text{Wp}} \times \frac{G}{1000} \times \eta_{\text{system}} $$


3. Daily Energy From the Sun — Peak Sun Hours (PSH)

To convert varying irradiance into daily energy, the industry uses:

Peak Sun Hours (PSH)

Equivalent hours per day at 1000 W/m² producing the same total energy.

\[ \text{PSH} = \frac{\text{Daily Solar Energy (Wh/m²)}}{1000} \]

If a site gets 5.4 kWh/m²/day → PSH = 5.4 hours

PSH incorporates morning ramp-up, mid-day peak, and afternoon drop.


4. Off-Grid Solar Oversizing — Core Design Principle

In off-grid systems, PV often exceeds battery charging power. The purpose is to:

  • Start charging earlier in the morning
  • Support daytime loads directly without passing through batteries
  • Reduce battery cycling & battery cost
  • Extend PV contribution beyond battery limits

This is known as PV oversizing.

⭐ The three jargon terms the industry uses:


4.1 PV-to-Battery Ratio (PB Ratio)

🔥 The most precise term for what OVES does.

\[ \text{PB Ratio} = \frac{P_{\text{PV-array}}}{P_{\text{max battery charge}}} \]

Where:

  • PV array = total Wp
  • Battery charge power = based on charger rating, battery C-rate, MPPT limit

Typical PB Ratio Values:

  • 0.8–1.2 → balanced system
  • 1.5–2.5 → off-grid with daytime load
  • 2.0–3.5 → microgrids + productive use
  • 3.0–6.0 → e-mobility charging with small battery buffers

A high PB ratio means:

  • More direct solar to load
  • Less energy forced through battery cycles
  • Battery can be smaller
  • Some noon solar will be clipped (acceptable)

4.2 PV Oversize Ratio (vs MPPT Rating)

Common for MPPT and inverter manufacturers.

\[ \text{Oversize Ratio} = \frac{P_{\text{PV-array}}}{P_{\text{MPPT-rating}}} \]

Industry norms:

  • 1.0 → matched
  • 1.2–1.5 → common
  • 1.5–2.0 → normal in off-grid
  • 2.0–3.0 → aggressive but effective

Oversizing is allowed because the system limits power electronically.


4.3 Daytime Solar Fraction (Load Offset)

\[ \text{Daytime Solar Fraction} = \frac{\text{Load served directly by solar}}{\text{Total daily load}} \]

Higher PV oversizing → higher daytime solar fraction → lower battery cycling.

This is the economic reason oversizing is attractive.


5. Clipping — A Normal Part of Off-Grid Oversizing

When PV power > MPPT/battery limit, the system “clips” the extra.

This is called clipping loss.

Industry view:

“Clipping is cheaper than batteries.”

Oversizing PV is much cheaper than adding battery capacity, and:

  • Excess solar at noon is less valuable
  • Early morning & late afternoon solar are extremely valuable
  • Battery cycling reduction is financially significant

Thus, clipping is considered good design, not a waste.


6. Standard Sizing Ratios in Off-Grid Design

We integrate these terms into typical design practice:

Array-to-Load Ratio (ALR)

\[ \text{ALR} = \frac{P_{\text{PV-array}} \times \text{PSH}}{\text{Daily Load}} \]

A general performance checkpoint, not a control parameter.

Solar Charging Ratio (SCR)

\[ \text{SCR} = \frac{P_{\text{PV-array}}}{\text{Battery Ah at C-rate}} \]

Used mostly by battery and charge controller vendors.

PV-to-Battery Ratio (Primary OVES metric)

This is the one we’ll emphasize in curricula.


7. Seasonal Solar Variation — Engineering Practices

Common industry methods:

  1. PV oversizing (20–100%)
  2. Larger battery storage
  3. East–West orientation for longer solar window
  4. Load shifting to mid-day
  5. Hybrid backup (generator, grid)
  6. MPPT control strategies (dynamic limits)

Oversizing PV is always the lowest-cost solution.


8. How Oversizing Improves Real Daily Performance

Early morning irradiance might be only:

  • 100–200 W/m² → 10–20% of STC power

But a 2× oversized PV array means:

  • The system "wakes up earlier"
  • Battery starts charging earlier
  • More solar goes to loads directly
  • Battery state-of-charge rises faster
  • Evening battery discharge depth is reduced

At noon, even if part of PV is clipped, the net daily Wh is higher, and the battery investment is lower.


9. Summary Table of Industry Jargon

Term Definition Purpose
Irradiance (W/m²) Instantaneous sunlight power Drives PV output
Wp (Watt-peak) PV rating at STC Standard PV sizing
PSH (Peak Sun Hours) Daily equivalent full sun hours Daily energy modeling
ALR (Array-to-Load Ratio) PV energy vs daily load Check system balance
SCR (Solar Charging Ratio) PV vs battery C-rate Charge control sizing
PV Oversize Ratio PV array vs MPPT rating Determines clipping
PV-to-Battery Ratio (PB Ratio) PV power vs battery charge limit KEY design lever for off-grid
Daytime Solar Fraction Load served directly by solar Economic efficiency
Clipping Loss PV > MPPT limit energy Expected & acceptable

✔ Recommended OVES Terminology (for documentation)

Use these phrases in training & product briefs:

  • “We design with a high PV-to-Battery Ratio to maximize daytime solar utilization and minimize battery cycling.”
  • “Clipping is not waste — it is a design strategy that reduces battery investment.”
  • “Oversized solar ensures early morning charging and greater direct-to-load support.”
  • “Battery size no longer determines daily system capacity when PV is oversized.”